Drilling 100 Questions, Part 3


Part Three: Well Control

73. What are the phenomena of overflow? What are the underlying causes?

Answer: Overflow phenomenon:

① Drilling speed increases, even leading to well kicks, while circulating pressure drops;

② The return flow velocity of the drilling fluid increases, causing the liquid level in the drilling fluid tank to rise;

③ Oil slicks, foaming, or increased salinity in the drilling fluid indicate changes in its performance.

④ When pulling out the drill string, the volume of drilling fluid injected is less than the volume of the drill string removed; when running in the drill string, the volume of returning drilling fluid exceeds the volume of the drill string inserted.

⑤ When the well is empty, drilling fluid cannot be pumped in, or there is continuous overflow. During the trip downhole, drilling fluid continuously returns to the surface or even flows back up through the drill string; in severe cases, well kicks may occur.

Reasons for overflow:

① Uncertain about the formation pressure, resulting in an under-designed drilling fluid density;

② Due to pulling the drill string or well leakage, the fluid level inside the well drops;

③ Drilling fluid density decreases due to oil and gas influx or other reasons;

④ Drilling and swabbing operations cause overflow.

74. Why is it important to quickly shut in the well after a blowout occurs?

Answer: ① Controlling the wellhead keeps well control operations proactive, which helps achieve safe well-killing procedures;

② Prevent the bottom fluid from continuing to enter the well;

③ Can maintain a larger volume of drilling fluid in the wellbore, reducing casing pressure during shut-in and well-killing operations;

⑤ Can accurately determine the bottomhole pressure and kill fluid density.

75. What are the contents of the "Four-Sevens" well-control actions?

Answer: (1) Overflow occurs during drilling

① Issue a signal—When the on-duty worker detects a well kick, they immediately notify the driller, who promptly sounds a long whistle signal (typically lasting at least 30 seconds). The shift supervisor then promptly boards the rig floor to take full command.

② Stop drilling: While the driller sends a signal, quickly disengage the rotary table clutch to halt the drilling operation. Then, lift the drill string—first stop the mud pump, followed by shutting down Unit #1, and switch to Unit #2 or Unit #3 for continued operations. At night, the power generator operator should first turn on the searchlight, then promptly turn off all other power sources at the fluid control console.

③ Retrieve the square drill pipe—The driller lifts the drill string, exposing the body of the first drill pipe below the square drill rod about 0.5 meters above the rotary table surface. Meanwhile, the inner and outer riggers securely engage the slip (note that the drill pipe must not rest on the slip before closing the wellhead preventer).

④ Open the No. 3 flat valve (in winter, open No. 1 valve) — The site operator swiftly opens No. 3 valve (or No. 1 valve in winter). Once opened, clearly signal to the supervisor (or liaison officer) that the gate has been activated (the flat valve must be fully open when opening, and tightly closed when closing; the same applies hereafter).

⑤ Well Shut-in Device – The assistant driller quickly positions himself in front of the remote control panel, standing by to shut in the well and promptly performing the following three checks.

a. Is the power switch in the automatic position?

b. Are all oil pressures normal?

c. Are all gates and handles in normal condition?

Upon receiving the well-shut-down instruction, promptly close the well—first closing the annular preventer, followed by the half-closure gate valve. At this moment, both inner and outer riggers should monitor whether the wellhead has been fully closed (the handle must remain in the closed position for at least 15 seconds).

⑥ Annular Choke Valve – After confirming that the wellhead preventer is fully closed, the supervisor issues the command to the floorhand to operate the annular choke manifold. While closing the annular choke valve, the floorhand monitors whether the casing pressure at the wellhead has reached the maximum allowable shut-in casing pressure. If, after closing the valve to its minimum position, the casing pressure remains below the maximum allowable shut-in value, the floorhand should then close the #15 ram valve. Once the casing pressure reaches the maximum allowed shut-in value, maintain this pressure and proceed with controlled bleed-off (for Type III wellheads, do not close the #3 gate valve—instead, simply recover drilling fluid or perform a controlled blowout).

⑦ Record overflow data—Generally, after shutting in the well for 10 to 15 minutes, once the pressure stabilizes and the well pressure reaches equilibrium, record the following data.

a. Shut-in Casing Pressure

b. Drilling fluid pit: Drilling fluid volume increase

c. Shut-in Standpipe Pressure

After completing the above actions and finishing the well-shut-in procedure:

1) The content to be reported to superiors includes:

a. Overflow data—three items (overflow rate, standpipe pressure, and casing pressure).

b. Downhole conditions (wellbore structure, drill bit position).

c. Condition of the blowout prevention equipment.

d. Worsen equipment condition.

e. Heavy drilling fluid and weighting material reserves.

f. Status of safety facilities (fire protection, anti-toxicity measures) equipped.

2) Key precautions for shutting in the well include:

a. After shutting in the well, do not release water to relieve pressure—instead, use the choke manifold to safely bleed off the pressure, preventing blockage of the drill bit's water ports.

b. Continuously monitor the standpipe pressure and casing pressure changes. If the standpipe pressure rises, adjust the choke valve to release pressure as needed, ensuring that the standpipe pressure remains approximately 1 MPa higher than the shut-in standpipe pressure.

3) The key operational guidelines for transitioning from a shut-in condition to a well-killing condition are:

a. Slowly start the pump, quickly open the 15# plate valve, and maintain the shut-in casing pressure by adjusting the 17# choke valve.

b. Once the displacement reaches the kill displacement, maintain the kill displacement constant and adjust the choke valve based on the standpipe pressure value specified by the well-killing operation team.

Alarm cleared—when the casing pressure and standpipe pressure both drop to zero after well control operations, a rhythmic signal consisting of one long beep followed by one short beep will be sounded. First, the floorhand opens Valve No. 15, then gently turns the Choke Valve No. 17 open by 3 to 5 full turns. Next, the floorhand raises both arms outward in a sweeping motion, signaling that there is no longer any casing pressure. The driller-in-charge then instructs the assistant driller to open the blowout preventer. Only after confirming that the blowout preventer is fully open can the driller resume normal operations. Meanwhile, the floorhand follows the standard procedure to open and close the gate valves as usual. Upon hearing the signal, all crew members return to their respective positions to continue their tasks. Finally, during shift handover, the on-duty supervisor will summarize and provide feedback on the day’s activities.

(2) Overflow Occurs During Drilling and Tripping

①, ④, ⑤, and ⑥ are identical to the provisions in (1).

② Stop drilling and tripping—when the stand is just about to be connected or has already been disconnected, quickly push it into the drill pipe box. The rigger then opens the elevator, while the driller lowers the traveling block. Once the traveling block clears the crown block, the derrickman climbs down from the derrick. During the tripping process, the drill string stands should immediately be seated on the rotary table using the elevator.

③ Quickly connect the back-pressure valve—both inner and outer riggers must secure the connection with the back-pressure valve already open. (If the flow is strong, first attach the open swivel joint, then close the swivel joint after connecting it properly, followed by attaching the back-pressure valve before reopening the swivel joint.) Once securely fastened, engage the lifting ring, carefully raise the drill string until the slip collar lifts off the rotary table surface by 0.1 to 0.3 meters, and then proceed to close the wellhead preventer.

⑦ Admission Documents — Admission:

a. Casing pressure

b. Overflow Volume

c. Measure the shut-in standpipe pressure (connect the square drill pipe; under shut-in conditions, build up pressure using the smallest possible flow rate. When the casing pressure slightly exceeds the initial shut-in casing pressure—by about 0.5 to 0.7 MPa—stop pumping. The shut-in standpipe pressure at this point is then calculated by subtracting the increment of casing pressure from the current standpipe pressure).

(3) When running and pulling drill collars

①, ④, ⑤, and ⑥ are identical to the provisions in (1).

② Cease operations.

③ Quickly connect the drill pipe fitted with a drill collar and joint, release the safety slips, and lower the drill pipe into the wellbore. Then, attach the back-pressure valve (if there’s significant flow, first connect the open swivel joint, close it after securing the connection, attach the back-pressure valve, and finally reopen the swivel joint). Next, use the elevator to position the joint just below the wellhead gate.

⑦ Same as clause ⑦ in (2), but since there are fewer drill pipes, there is no need to monitor the riser pressure.

(4) When the well is empty

①, ④, ⑤, and ⑥ are identical to the provisions in (1).

② and ⑦ are identical to the provisions in (3).

③ The drilling team aims to control the wellhead and is not required to retrieve the drill pipe. When retrieval becomes necessary, the decision will be made by the well-control management commander appointed by each drilling company.

(The drilling team must strictly adhere to the regulation prohibiting empty wells—specifically, after completing the drill-out operation and replacing the drill bit, they are only permitted to proceed with inspections or other tasks once the bit has been lowered near the casing shoe.)

76. What preparations need to be made before drilling into oil and gas formations?

Answer: (1) Conduct technical briefings for all team members on four key areas: engineering, geology, drilling fluids, and well-control equipment.

(2) The drilling fluid density and other properties meet the design requirements, and there is an adequate supply of drilling fluid weighting agents and treatment chemicals.

(3) All well-control equipment, specialized tools, fire-fighting gear, and electrical systems are fully equipped and in good working condition.

(4) Investigate and verify the status of nearby water injection wells being shut down, as well as the construction activities involving the opening of oil and gas reservoirs in adjacent wells.

(5) Implement well-closure procedure operation posts and the on-duty system for management personnel.

(6) All team members are required to conduct a well-killing drill at the team level and meet the specified drill requirements.

77. What is primary well control? What are the five key components of primary well control?

Answer: Primary well control refers to using the hydrostatic pressure of the drilling fluid to balance formation pressure, thereby preventing formation fluids from entering the wellbore.

The five tasks that the drilling team should properly perform are:

① Conduct technical briefings and strictly adhere to the design and technical measures. Ensure sufficient reserves of heavy drilling fluids, weighting materials, and drilling fluid additives, and maintain the drilling fluid density at or above the design upper limit during trips.

② When pulling out of the hole, continuously fill the wellbore with drilling fluid to minimize empty-well time. During this period, assign a dedicated person to closely monitor the wellhead and ensure proper circulation of the drilling fluid.

③ Daily check and ensure the implementation of water injection well shutdown and pressure relief procedures.

④ Keep the wellbore clear and ensure that the drill string does not pull out the piston during tripping.

⑤ Wells with shallow gas zones should be circulated with drilling mud before starting the drill. When entering the gas zone, ensure that circulation is not interrupted; after confirming normal circulation, connect the next drill pipe and resume drilling.

78. What is a soft shut-in? How is a soft shut-in performed?

Answer: After a kick is detected, the first step is to open the choke manifold, then close the blowout preventer, and finally close the well using the choke manifold's shut-in method. This procedure is known as a soft shut-in.

79. What precautions should be taken when using the manual locking device of a ram-type blowout preventer?

Answer: (1) The manual locking device can only be used to close the gate, not to open it.

(2) To open the gate valve, first unlock and reset the manual locking mechanism, then use hydraulic pressure to open the valve.

80. Why should you turn a manual flat valve back 1/4 to 1/2 turn after closing it completely?

Answer: This is because the manual flat valve must be in a floating position to achieve a tight seal; if closed too tightly, the gate loses its floating function, leading to leakage. Therefore, after fully closing the valve, you should turn it back by 1/4 to 1/2 a turn.

81. What is the driller's method for well control? And what is the engineer's method for well control?

Answer: The司钻 method for well control involves, after shutting in the well due to a kick, first circulating with the original-density drilling fluid while throttling to remove the overflow. Once the overflow is cleared, heavier drilling fluid is then used to kill the well, completing the process over two circulation cycles. This method is typically employed in remote wells or when weighted materials cannot be supplied promptly.

Engineers' kill method, also known as the one-cycle method, involves quickly shutting in the well after a kick occurs. Based on calculations of formation pressure, heavier drilling fluid is prepared and used to complete the well kill within a single circulation cycle.

Chengdu Tdrill Energy Technology Co., Ltd.

Related News


A New Journey, Achieving Success Today|The annual gala of Chengdu Tdrill Energy Technology Co.,Ltd. concludes successfully, setting sail on a new chapter with renewed vigor.

The annual meeting of Chengdu Tdrill Energy Technology Co.,Ltd., themed "Leap into a New Journey, Achieve Success Today," has concluded successfully. All colleagues and guests gathered together to review past achievements, outline plans for the new year, recognize outstanding individuals, unite our strengths, and jointly embark on a new journey of high-quality development for the company.


2026 Spring Festival Holiday Notice

Our company is pleased to announce the 2026 Spring Festival holiday schedule: The holiday period will run from February 11, 2026 (the 22nd day of the 12th lunar month) to February 23, 2026 (the 7th day of the 1st lunar month). Normal office operations will resume on February 24, 2026 (the 8th day of the 1st lunar month). During the holiday period, routine business processing will be temporarily suspended. We will promptly respond to any inquiries or collaboration requests once we resume work. On this joyous occasion of the Spring Festival, our company extends festive greetings to all our valued customers. We deeply appreciate your long-term support and trust, and wish you a happy Spring Festival and smooth sailing in all your endeavors.


PDC Drill Bits Crossing Intersecting Formations: How to Avoid Damage Caused by “Instantaneous Overload”

In oil drilling operations, the transition zone where the drill bit moves from soft rock formations into hard rock formations (or vice versa) is often a high-risk area for drill bit damage. A recent study, using sophisticated digital simulations, has revealed the underlying mechanical mechanisms behind this phenomenon and proposed effective solutions.

Product Inquiry

Please fill in the question you’d like to consult about, and we’ll provide you with the appropriate product support based on your needs!