100 Questions About Drilling—Part Four


Part Four: Drilling Fluid

82. How to determine the drilling fluid density?

Answer: The basis should be the highest formation pressure gradient of the open-hole interval, with an additional 0.05–0.10 g/cm³ for oil zones and 0.07–0.15 g/cm³ for gas zones.

83. What are the hazards of drilling fluid viscosity and gel strength being too high or too low during drilling?

Answer: Viscosity and yield stress are too high.

(1) Pumping is difficult, and the pumping pressure is too high, easily causing pressure surges that may lead to formation leakage.

(2) Cause the drilling rate to decrease;

(3) High circulating pressure loss and elevated total pump pressure are detrimental to optimized-parameter drilling;

(4) Easily causes mud to wrap around the drill bit, leading to surging during pumping operations;

(5) Susceptible to gas invasion; difficult to remove gas;

(6) Drilling cuttings and sand are difficult to remove, which affects the solids-control performance and consequently leads to equipment and drill-string wear.

(7) A thick mud cake (sand cake) forms on the wellbore wall, making it difficult to run and pull drill strings and increasing the risk of sticking.

(8) Drilling fluids are difficult to maintain and challenging to handle.

Viscosity and shear force too low:

(1) Poor carrying and suspension capabilities lead to ineffective well-cleaning, easily causing barite and drill cuttings to settle and resulting in stuck pipe.

(2) Erosion of the wellbore walls, leading to spalling and collapse;

(3) Leaky formations are prone to fluid loss.

84. How to adjust the viscosity of drilling fluid?

Answer: (1) Poor carrying and suspension capabilities lead to ineffective well-cleaning, easily causing barite and drill cuttings to settle and resulting in stuck pipe incidents;

a. Add bentonite or hydrated bentonite slurry to increase the bentonite content;

b. Add a dispersant to enhance the clay's dispersion;

c. Add a polymer tackifier;

d. Utilize polycationic colloids to enhance viscosity and shear resistance;

(2) Methods to reduce drilling fluid viscosity include:

a. Utilize solids control equipment to remove clay solids;

b. Dilute with clean water or a low-concentration solution;

c. Add an organic diluent for dilution treatment;

d. For viscosity increases caused by chemical contamination, decomposition flocculation, salt resistance, dilution, and protective colloidal treatments can be applied.

85. What factors influence the static filtration vector of drilling fluids? How can the filtration vector of drilling fluids be controlled?

Answer: The factors influencing the static filtration rate of drilling fluids include: filter cake permeability, pressure differential, filtrate viscosity, filtration time, temperature, chemical contamination, and formation permeability, among others. Among these, the most critical factor is the permeability of the filter cake. A dense, low-permeability filter cake is key to controlling the filtration rate.

Method for controlling the filter vector:

(1) Use flaky fine particles and a thick hydration film to form a dense filter cake;

(2) Add an appropriate amount of dispersant to enhance the clay's zeta potential, hydration level, and degree of dispersion;

(3) Add a diluent and a stabilizer to protect the fine clay particles, preventing them from agglomerating, which in turn helps enhance the clay dispersion.

(4) Add some ultra-fine colloidal particles to block the filter cake pores, thereby reducing the filter cake's permeability.

(5) Add an organic polymer fluid-loss additive to increase the viscosity of the filtrate, thereby enhancing filtration resistance.

86. What are the hazards of excessive drilling fluid filtration volume during drilling? Is a lower filtration volume always better, and why?

Answer: When the filtrate loss of drilling fluid is excessive and the filtrate lacks inhibition and shale-stabilizing capabilities, it can lead to complex downhole conditions. For instance, in water-sensitive shale formations, drilling tends to cause wellbore collapse and shrinkage. Additionally, high-solids drilling fluids, due to their excessively large filtration volume, form filter cakes that are too thick, resulting in severe wellbore shrinkage, difficulty in running or pulling drill strings, and ultimately compromising cementing quality.

During drilling, maintaining an适度 filtration vector is ideal—lower isn’t always better. For instance, when drilling in the upper wellbore sections, if the filtration vector is too low, the resulting borehole may be smaller. Meanwhile, the upper formations often contain high levels of montmorillonite, which is prone to hydration, swelling, and shrinkage, potentially leading to stuck pipe during tripping operations or difficulty in running the drill string down. On the other hand, keeping the filtration vector moderately higher in the upper formations can effectively enhance the inhibition and anti-collapse capabilities of the filtrate, producing a relatively larger borehole. As you transition into the deeper formations, reducing the filtration vector further ensures that, even if some hydration-induced swelling and shrinkage occur in the upper zones, the larger borehole diameter will prevent any significant sticking or dragging issues during tripping operations.

87. What are the hazards of high solid content in drilling fluids?

Answer: (1) Reducing the mechanical drilling rate lowers the drill bit's lifespan.

(2) The filtration vector is large, resulting in a thick filter cake with high density. This allows drilling fluid filtrate and solid particles to invade the oil reservoir, thereby damaging and reducing the well's production capacity.

(3) The filter cake quality is poor, easily leading to sticking and getting stuck during drill string movement, as well as causing issues such as well leakage and wellbore collapse.

(4) Affects cementing quality.

(5) Causes severe wear on drill strings and drill bits, leading to premature scrapping.

(6) The core logging was disturbed, causing issues with the electrical measurements and resulting in inaccurate well-logging data.

(7) Consumes large amounts of water, drilling fluid raw materials, and treatment agents.

Additionally, the water loss of positively charged colloidal drilling fluid should not be too low, to prevent high liquid-phase viscosity in the stagnant layer, which could lead to poor sand-carrying capacity or even no sand production—potentially causing downhole complications.

88. What hazards need to be addressed to maintain low solids content in drilling fluids?

Answer: (1) The drilling fluid should contain an adequate amount of organic polymer flocculants, coating agents, or cationic gel inhibitors to ensure that cuttings and clay generated during bit penetration of the formation are minimized from hydration and dispersion as they return from the bottom of the well to the surface.

(2) The drilling fluid should have sufficient cuttings-carrying capacity, minimizing the time it takes for drill cuttings to return from the bottom of the well to the surface and ensuring their rapid removal from the drilling fluid.

(3) Equip with complete solids-control equipment and ensure the effective utilization rate of the equipment.

89. What are the methods for controlling solid phases in drilling fluids?

Answer: (1) Chemical Method:

a. Chemical treatment agents inhibit hydration and dispersion, while coating drill cuttings.

b. Chemical treatment agents coagulate fine particles, making them easier to remove.

(2) Physical Method:

a. Dilution method: Add water to reduce the solid-phase content.

b. Natural Sedimentation Method: Settling through a circulation system.

c. Partial Drilling Fluid Replacement Method: Replace a portion of the original drilling fluid with low-solids drilling fluid.

(3) Mechanical Separation Method:

Use solid-phase control equipment to forcibly remove the material. Only by combining these three methods effectively can you achieve optimal solid-control results.

90. What are the hazards of excessive sand content in drilling fluids?

Answer: (1) High sand content increases the solid-phase content of the drilling fluid, thereby reducing the drilling rate.

(2) High sand content leads to thick, loose filter cakes with poor cementing performance, making shrinkage more likely. This can result in drill string sticking due to piston action during tripping, potentially causing wellbore collapse and instability. Additionally, the increased friction coefficient of the filter cake may lead to adherential sticking, compromising cementing quality and affecting logging operations—specifically causing difficulties in running and retrieving tools, as well as inaccuracies in geological data.

(3) High sand content leads to wear on drill bits, drilling tools, and mechanical equipment, shortening their service life, increasing the frequency of maintenance, and extending drilling time.

(4) High sand content increases the solid-phase content of the drilling fluid, leading to unstable fluid properties, more frequent treatment cycles, higher doses of treatment agents, and ultimately, increased drilling costs.

91. What are the methods for maintaining and handling drilling fluids during rapid drilling of upper formations?

Answer: (1) The formation in this section is relatively soft, consisting mainly of clay layers, mudstone layers, sand layers, quicksand, and other materials that cause severe mud-making. Therefore, it’s crucial to ensure that sand and cuttings settle out quickly at the surface. The drilling fluid should maintain low viscosity, low shear, low density, and minimal solids content. Primarily, the fluid relies on high-molecular-weight polymer-based flocculants for effective suspension, supplemented by dilution with fresh water. Around 50 meters before pulling out of the hole, switch to a smaller circulation loop to perform chemical treatment, helping to form a robust filter cake that stabilizes the wellbore walls.

(2) During drilling, clean water should be continuously replenished. If the water source is insufficient and cannot be topped up, drilling should be halted immediately. At this point, adjust the drilling fluid properties and pull the drill string out of the hole to allow water to circulate naturally. Under no circumstances should you rely on prolonged circulation alone to maintain adequate water levels—or worse, attempt forced drilling—since this could lead to complex wellbore conditions.

92. What are the requirements for drilling fluids in scientific drilling?

Answer: (1) Using high-quality drilling fluids helps ensure the comprehensive and accurate collection of geological and engineering data, facilitates the discovery and protection of oil- and gas-bearing formations, and supports safe drilling operations.

(2) Exploration wells should be equipped with appropriate drilling fluid systems and types, selected based on rock and mineral composition analysis, reservoir property data, and the magnitude of formation pressure. The drilling fluids are required to exhibit low solids content, minimal fluid loss, low friction, excellent sand-carrying capacity, and superior thermal stability.

(3) Design the drilling fluid density based on the formation pore pressure gradient provided in the geological design. When entering oil formations, add 0.05–0.10 g/cm³ to the drilling fluid density; for gas formations, add 0.07–0.15 g/cm³. This approach enables near-balanced pressure drilling.

(4) The treatment agents used in exploratory wells must not interfere with geological logging. In carbonate formations, weighting agents should preferably be acid-soluble materials, and clay content should be minimized.

(5) Meet logging requirements.

(6) Ensure proper coordination of solids control equipment to maintain low sand content and solid-phase levels.

93. What are the completion logging, drilling fluid operations, and engineering measures involved?

Answer (1): 30–50 meters before reaching the target depth, stop directly adding powdered polymers to the drilling fluid. Instead, thoroughly mix the fluid according to design specifications to ensure stable and optimal performance.

(2) After drilling is completed, increase the diesel engine speed and perform high-volume well cleaning. When virtually no drill cuttings return to the shale shaker, gradually increase the mud viscosity and shear strength before proceeding with the wireline logging operation.

(3) For well sections with frequent cuttings, before pulling out of the hole, use CMC or other chemicals to prepare a high-viscosity drilling fluid for well sealing (typically with a viscosity of 60–100 seconds). After performing a short trip to ensure bottom-to-bottom circulation, you may then proceed with the wireline logging. When pulling out of the hole, use a rotary swivel to unscrew and retrieve this well section safely.

(4) Continuously circulate drilling fluid while pulling out of the hole to prevent wellbore collapse and blowouts.

(5) If the wellbore is not clear during tripping out, you can lower the drill string back to the bottom of the well, pump circulation to clean the wellbore, and then proceed with tripping out using first gear.

(6) During electrical logging, it is essential to promptly refill the drilling fluid.

94. What are the main reasons for encountering resistance during electrical measurements?

Answer: (1) Due to the drilling fluid type being unsuitable for downhole conditions, collapse and borehole shrinkage occurred, resulting in a "tanghulu" (candied hawthorn stick) wellbore.

(2) The drilling fluid lacks sufficient structural strength and has poor suspension capacity, leading to the settling of solid phases (weighting agents and drill cuttings), which in turn forms a "sand bridge."

(3) The drilling fluid exhibits a high filtration volume, leading to easy hydration and swelling of the formation, causing borehole shrinkage, while permeable sand layers develop thick mud cakes.

(4) The drilling fluid has low density, leading to oil, gas, and water invasion, which affects the performance of the drilling fluid.

(5) High-temperature thickening and high-temperature thinning lead to poor drilling fluid stability.

(6) Small displacement and low upward velocity result in poor cuttings removal, leading to sand settling at the bottom of the well.

95. What measures should be taken if the "Tanghulu" wellbore encounters resistance or gets stuck during electrical logging?

Answer: ① Seal the well using high-viscosity drilling fluid; rotating the rotary table to remove the drill collar is strictly prohibited in this well section.

② Repeatedly run a female taper or large connection through this well section to shave off the lower shoulder and eliminate any sticking issues;

③ Place the stabilizer in the middle of the drill collar, and use the stabilizer to ream the hole, thereby eliminating the issue of getting stuck at the upper shoulder.

④ The "serrated" wellbore section can be reamed out using a roller cone drill bit;

⑤ Drill down to the bottom, first using high displacement to carry away cuttings and loose debris, then switching to low displacement (reducing rotational speed) to stabilize and reinforce the wellbore walls. Finally, seal the well with high-viscosity drilling fluid, pull out the sealed section, ensure smooth circulation after dry-drilling through it, and continue pulling until the entire string is retrieved.

⑥ Adding a bent tubing string or guided weighting at the bottom of the logging tool is also highly effective in eliminating stuck conditions during "tanghulu"-type wellbore logging.

96. What causes acoustic and electrical logging to encounter resistance during well completion? How can it be prevented?

Answer: The reasons for acoustic-electric logging encountering resistance:

(1) Improper displacement of slurry, leaving a cement plug inside the casing;

(2) Drilling fluid has high solid content and thickens significantly at elevated temperatures;

(3) The drilling fluid has poor resistance to calcium invasion;

(4) Poor suspension capacity of the drilling fluid leads to sand settling;

(5) The drilling fluid thickens as it mixes with the cement slurry.

Prevention methods:

(1) Accurately replace the cement slurry, ensuring no cement plug remains inside the casing;

(2) The drilling fluid has an appropriate solid content, stable performance, and does not exhibit high-temperature thickening or high-temperature thinning. It maintains excellent suspension capability and prevents sand settling.

(3) Enhance the drilling fluid's resistance to contamination, properly prepare the barrier fluid, and prevent the drilling fluid from mixing with cement slurry and causing thickening.

97. How should drilling fluid treated after oil and gas invasion?

Answer: After detecting a gas or oil influx, stop the pump and monitor the wellhead. If there is any overflow, shut in the well to build up pressure. If there’s no overflow at the wellhead and both the standpipe pressure and casing pressure read zero, determine whether to increase the mud weight based on the severity of the influx. If the influx is severe and requires加重 (increasing the mud weight), do so gradually—incrementally raising the density by 0.03 to 0.05 g/cm³ per week—to avoid sudden changes that could lead to well kicks or lost circulation. After each adjustment, continue circulating while monitoring the mud density. If the performance stabilizes and the density remains constant, it indicates that formation pressure has been successfully balanced. Alternatively, you can perform short trips to measure the rate at which gas or oil is migrating upward. Ensure that the density increase keeps the migration speed below 10 meters per hour. In cases where drilling fluid contamination is severe, implement targeted treatment measures to remove oil and gas from the system. While increasing the mud weight, simultaneously replenish the polymer additive according to a specific ratio, based on the amount of barite powder added, to maintain the drilling fluid’s excellent suspension properties and minimize mud cake friction.

When handling oil- and gas-invaded drilling fluids, water should be added appropriately. This is because treating such fluids requires a certain amount of water when adding treatment agents and weighting materials. Otherwise, the drilling fluid becomes difficult to manage, its flowability deteriorates, oil and gas are less likely to be expelled from the fluid, and it becomes challenging to increase the fluid's density.

98. How should drilling fluid be handled when encountering stuck pipe or having to ream while drilling below the Dongying Formation?

Answer: (1) Activate all purification equipment and, if necessary, use chemical solutions to reduce the solid content in the drilling fluid.

(2) Dilute the drilling fluid to achieve low viscosity, low shear, low solids content, minimal fluid loss, and excellent mudcake-forming properties, ensuring stable wellbore conditions during drilling.

(3) Continuously replenish the polymer to ensure the drilling fluid maintains an adequate polymer concentration, thereby controlling the clay dispersion that enters the fluid during hole-cleaning operations.

99. Since drilling through the Sha-3 section was hindered by a sand bridge, what measures should be taken for the drilling fluid?

Answer: (1) Drill down into the upper part of the sand bridge, pre-treat the drilling fluid to maintain good fluidity, and then add a high-molecular polymer or active bentonite to increase the drilling fluid's yield value, thereby facilitating sand removal.

(2) Large displacement, low bit pressure for reaming.

(3) Start the purification equipment to promptly remove the sand that has been swept out.

(4) Add a high-temperature fluid-loss reducer and asphaltene anti-collapse material to stabilize the previously drilled wellbore.

100. What measures should be taken if mudstone and shale collapse or fall off during drilling in the Shahejie Formation?

Answer: (1) When collapse or spalling occurs, do not stop the pump. Instead, replenish the anti-collapse agent during circulation to maintain its concentration at 1%–1.5%. Additionally, add high-temperature-resistant fluid-loss additives such as SMP to enhance viscosity and effectively reduce high-temperature fluid loss, which will typically help control wellbore instability.

(2) The collapse issue caused by the drilling fluid density being too low is primarily due to the hydrostatic pressure failing to balance the formation pressure. To address this, the drilling fluid density can be appropriately increased—up to or even slightly above the design limit—to effectively resolve the collapse problem.

(3) Due to the well-developed bedding in mudstone and shale, severe sloughing and block shedding occur. When reducing water loss and increasing density do not yield significant improvements, a polyol resin is employed, leveraging film-forming technology to prevent collapse.

(4) After the collapse issue is resolved, wait until the sand has been completely circulated away before stopping the pump and pulling out of the hole. Otherwise, a large amount of settled sand could cause the drill string to get stuck when the pump is stopped. Before pulling out of the hole, you can use CMC or SMP to prepare a high-viscosity drilling fluid (funnel viscosity 60–100 seconds) to seal the collapsed section. Drilling operations in this section must strictly prohibit using the rotary table to unscrew the drill pipe connections.

Chengdu Tdrill Energy Technology Co., Ltd.

Related News


A New Journey, Achieving Success Today|The annual gala of Chengdu Tdrill Energy Technology Co.,Ltd. concludes successfully, setting sail on a new chapter with renewed vigor.

The annual meeting of Chengdu Tdrill Energy Technology Co.,Ltd., themed "Leap into a New Journey, Achieve Success Today," has concluded successfully. All colleagues and guests gathered together to review past achievements, outline plans for the new year, recognize outstanding individuals, unite our strengths, and jointly embark on a new journey of high-quality development for the company.


2026 Spring Festival Holiday Notice

Our company is pleased to announce the 2026 Spring Festival holiday schedule: The holiday period will run from February 11, 2026 (the 22nd day of the 12th lunar month) to February 23, 2026 (the 7th day of the 1st lunar month). Normal office operations will resume on February 24, 2026 (the 8th day of the 1st lunar month). During the holiday period, routine business processing will be temporarily suspended. We will promptly respond to any inquiries or collaboration requests once we resume work. On this joyous occasion of the Spring Festival, our company extends festive greetings to all our valued customers. We deeply appreciate your long-term support and trust, and wish you a happy Spring Festival and smooth sailing in all your endeavors.


PDC Drill Bits Crossing Intersecting Formations: How to Avoid Damage Caused by “Instantaneous Overload”

In oil drilling operations, the transition zone where the drill bit moves from soft rock formations into hard rock formations (or vice versa) is often a high-risk area for drill bit damage. A recent study, using sophisticated digital simulations, has revealed the underlying mechanical mechanisms behind this phenomenon and proposed effective solutions.

Product Inquiry

Please fill in the question you’d like to consult about, and we’ll provide you with the appropriate product support based on your needs!